Swiftech H20 220 APEX ULTRA REV2 Manuel d'utilisateur Page 16

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 24
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 15
Copyright Swiftech 2007 – All rights reserved – Last revision date: 10-08-07 - Information subject to change without notice – URL: http://www.swiftech.com
Rouchon Industries, Inc., dba Swiftech – 3700 Industry Avenue, Suite 104, Lakewood, CA 90712 – Toll free (US) 888-857-9438 – Fax 562-595-8769 - E Mail:
PAGE 16 of 24
3. R
E
-
INSTALLING THE MOTHERBOARD
Now that the APOGEE water-block is securely fastened to the motherboard, go-ahead and install the motherboard into the chassis,
following the instructions provided in your motherboard installation guide.
4. P
UMP INSTALLATION
Error!
General Use
The MCP655-B pump is a magnetically driven
centrifugal pump featuring a 12 V DC motor. It
requires no maintenance when used with de-
mineralized water and the appropriate anti-fungal
additives. We recommend using 5% Swiftech’s
HydrX as an additive. The pump is designed to be
connected to your computer power supply using the
standard Molex 4 pin connectors.
The MCP655-B pump is neither submersible, nor
self- priming. The inlet needs to be continuously
supplied with fluid for the pump to operate properly.
Physical installation
Determine the best location for your pump by
observing how the tubing will be routed to the
rest of the circuit. Sharp bends in the tubing
should always be avoided to prevent kinks,
which will reduce or completely prevent flow of
the cooling fluid.
In general, we recommend installation of the
pump at the bottom of the chassis.
The base of the pump features a soft
neoprene pad coated with strong adhesive
material. Once the final location for the pump
has been determined, simply peel-off the
pad’s protective paper, and press the pump
against the chassis surface. The surface
should be clean, and non greasy. Thru-bolts
are also provided for permanent installation,
and require drilling holes in the chassis.
Pump operating
precautions:
The MCP655-B pump should never be run dry,
even for a quick test. You should always prime
the pump with fluid before you start operating it
(see warranty note *).
Use of coloring die or fluorescent additives
containing particulate fillers will cause excessive
wear to the pump’s impeller bearing (see warranty
note **).
Note 1: Always make sure to directly connect the RESERVOIR DISCHARGE to
the PUMP INLET.
Note 2: Please read important preamble in paragraph 5 below “Preparing the
Tubing” prior to installing the tubing to your pump.
Vue de la page 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Commentaires sur ces manuels

Pas de commentaire